• Load Bank for Generator Load Testing
  • Load Bank for Generator Load Testing
  • Load Bank for Generator Load Testing
  • Load Bank for Generator Load Testing
  • Load Bank for Generator Load Testing
  • Load Bank for Generator Load Testing

Load Bank for Generator Load Testing

After-sales Service: Yes
Material: Q235 Steel
Warranty: 12 Months
Protection Level: IP54
Voltage: 400V/415V/Customized
Rated Load: 500kw
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
RT5000KWLB
Application
Generator Load Testing
Customized
Customized
Surface Treatment
Powder Coating
Control Mode
Local Panel Manual + Remote PC Software
Color
Ral7035/Customized
Design
Outdoor Use
Movement
Forklift Holes/Universal Wheels
Certificates
CE/ISO9001/14001/45001
Transport Package
Wooden Pallet+Wooden Case
Specification
RT500KWLB
Trademark
RATA
Origin
China
HS Code
9030899090
Production Capacity
5 Sets/Month

Product Description

Load Bank for Generator Load Testing

HS Code: 9030899090
Certificates: CE,ISO9001,ISO14001,ISO45001


Following will be 500kW load bank for your reference.
Product Description

1: 500kW resistive load bank generally used for generator/ups/data center load testing.
2: 500kW load bank can be designed as indoor or outdoor used.
3: Control mode include local panel manual control and remote PC software control(support load data save and printing).
4: All main parts of the load bank will be international/China market first level brands to make sure quality(ABB/Schneider/Delixi/Siemens,etc.).
5: Standard color will be RAL7035 or customized RAL color number.
6: Forklift holes or universal wheels for movement.
7: Load power connected with copper bar,control power connected with terminal/fast connector.

Product Parameters
Model No. RT500kWLBA
Load type Resistive
Nominal Voltage AC380V/440V/400V/Customized
Frequency 50/60Hz
Capacity 500kW
Power factor 1.0 
Control mode Local panel manual control+remote PC software control(support load data save and printing)
Application environment Outdoor + canopy
 
Control power 3 phase 4 wire(380~400VAC)
Load accuracy ±3%
3Phase Balance Unbalance: ≤3%
Insulation F
Power source connection Load power source connection: copper bar 
Working power source connection: terminal
Time rating Continuous design

Resistive load
Min.step: Nominal 1kw resolution or customized
500kW steps: 1kW,2kW,2kW,5kW,10kW,10kW,20kW,50kW,100kW*4
Customized steps are available.
8020 Ni-Cr alloy finned resistor
Cooling system Cooling mode: forced ventilation,horizontal air inlet/outlet
Airflow/Fan power and air volume shall be designed according to 2 times surplus coefficient of heat loss.  
Power supply mode: 3 phase AC power supply.
Noise:≤ 85db (3M)
Load test functions Real time display of
Current,
Voltage,Frequency,Power ,Power factor,Electrical performance indicators,Curve and report output 
System electrical parameter monitoring,Automatic data acquisition
Sampling accuracy: 

Voltage: ±0.5%; Current: ±0.5%; Frequency: ±0.1%; Power: ±1%; Power factor: ±1%        
Load protection/ function Low air volume,High temperature,Fan interlock protection,Short circuit/over current,Emergency stop,Fan phase sequence automatic transfer protection,Operational indicator,Load switch
Color Color: RAL7035
Material: Q235 cold rolled steel plate.
Transportation Forklift holes/universal wheels
Dimension(L*W*H) 1910mm*1560mm*1430mm    
Weight 950kg   
Packing Wooden case + wooden pallet
Work Environment
Temperature -20ºC to 50ºC
Humidity up to 100%
Altitude up to 2500m
Atmospheric pressure 86 to 106kPa
Detailed Photos

Load Bank for Generator Load TestingLoad Bank for Generator Load TestingLoad Bank for Generator Load TestingLoad Bank for Generator Load TestingLoad Bank for Generator Load TestingLoad Bank for Generator Load TestingLoad Bank for Generator Load Testing

Company Profile

> Established in 2013
> 1600 square meters production shop
> 120 square meters office
> 22 employees
> 25 patents for load bank
> 10 years load bank design,production,service experience
> 8 computer software copyrights
> 7 stars after sales service certificate
> ISO9001:2015,ISO14001:2015,ISO45001:2018,CE certificates
> Clients come from include but not limited: South Korea,India,Kazakhstan,Indonesia,UAE,Denmark,France,Rwanda,New Zealand,Chile,Paris,Peru,America

Load Bank for Generator Load Testing
Certifications

CE,ISO9001,ISO14001,ISO45001

Load Bank for Generator Load Testing

Packaging & Shipping

Packing: put the load bank on the pallet,wrapping film,then packed with wooden case.
Shipping: generally exported from Shanghai port,China.othe China port also can be workable.


Load Bank for Generator Load Testing
FAQ

1:What is the HS code?
9030899090

2:What is the language of the operation instruction?
Generally the language will be English,but it can be your local language based on your help to translate it.

3:What is the language of the operation panel and control software?
Generally the language will be English,but it can be your local language based on your help to translate it.

4:What is the guarantee time?
Generally12 months start from commissioning on site.

5: Can you supply Certificate of Original?
Yes.

6: What are the brands for the components?
Contactor: ABB/Schneider,Breaker: ABB/Schneider,Fuse: Delixi,PLC: Siemens,Fan: Fengmai,Resistor: Zhuxing all are first level brand at international and China market.

7: What is the noise?
Actually noise:≤80dB(1m)

8:Do you support OEM?
Yes.

9:Do you support customized control software?
Yes.

10:What is the after sales service time?
We supply 7×24hrs after sales service.But maybe there is some delay caused by the time zone restrictions.

11:Who should we contact for the after sales service?
You may contact the salesman for the after sales service directly caused by the language restrictions.

12:What is the delivery time?
The delivery time based on the power capacity and quantity.

13:How to operate the load bank as "local-off-remote"?
There is indication for "local"and"remote" control on the local panel.And it is controlled by key. Turn the key to "local" direction,then can control the load bank manually;turn the key to "remote",then can control the load bank remotely.

14:Does it complicated to use the remote control software?
It is say to use the control software,we can supply the operation video for your reference.
 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
24
Year of Establishment
2013-09-09