• 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
  • 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
  • 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
  • 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
  • 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
  • 1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing

After-sales Service: 1 Year Warranty
Application: Electrical & Electronics
Customization: Available
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing pictures & photos
1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
US $16,000-17,500 / Piece
Min. Order: 1 Piece
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
HV-1000KW
Usage
Outdoor
Transport Package
Containerized
Specification
2300*1700*2100
Trademark
Rata
Origin
P. R. China
HS Code
9031809090
Production Capacity
300

Packaging & Delivery

Package Size
2300.00cm * 2100.00cm * 1700.00cm
Package Gross Weight
2100.000kg
Lead Time
60 days (1 - 5 Pieces)
To be negotiated ( > 5 Pieces)

Product Description

AC 3 Phase Air Cool Generator Load Testing Indoor Design Load Bank (Indoor design)

HS Code: 9030899090
Certificates:  ISO9001:2015,ISO14001:2015,ISO45001:2018,CE
You are welcome to visit our factory
We supply indoor/outdoor design,local panel and remote PC automatic control load bank. And OEM service.
All the main parts of the load bank will be the first level brands in China and international market.
Product Parameters
 
Model No. RT1000kWLBA
Load type Resistive
Nominal Voltage AC20KV/Customized
Frequency 50/60Hz
Capacity 1000kW
Power factor 1.0 
Control mode Manual + PC control(automatic control)
Application environment Indoor 
Fan power source Single phase 20KV
Load accuracy ±3%
3Phase Balance Unbalance: ≤3%
Insulation F
Power source connection Load power source connection: copper bar 
Working power source connection: fast connector
Time rating Continuous design

Resistive load
Steps: 0~10kW: tuning knob control
+ 10kW,10kW,10kW,20kW,20kW,20kW,50kW,50kW,100kW×8
8020 Ni-Cr alloy finned resistor
Cooling system Cooling mode: forced ventilation,horizontal air inlet/outlet
Axial fan,horizontal air intake and outlet.
Noise:≤ 85db (3M)
Load test functions Real time display of Current,Voltage,Frequency,Power ,Power factor,Electrical performance indicators,Curve and report output ;System electrical parameter monitoring,Automatic data acquisition;Sampling accuracy: Voltage: ±0.5%; Current: ±0.5%; Frequency: ±0.1%; Power: ±1%; Power factor: ±1%        
Load protection/ function Low air volume,High temperature,Fan interlock protection,Short circuit/over current,Emergency stop,Fan phase sequence automatic transfer protection,Operational indicator,Load switch
Color Color: RAL7035
Material: Q235 cold rolled steel plate.
Transportation Lifting holes
Dimension(L*W*H) 2120mm*1510mm*2100mm    
Weight 1400kg   
Packing Wooden case + wooden pallet+ wrapping film
Work Environment
Temperature -20ºC to 50ºC
Humidity up to 100%
Altitude up to 2500m
Atmospheric pressure 86 to 106kPa
 
Detailed Photos

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing

Packaging & Shipping

1000kW resistive load bank packed with wooden case and wooden pallet

Company Profile

> Established in 2013
> 1600 square meters production shop
> 120 square meters office
> 22 employees
> 25 patents for load bank
> 10 years load bank design,production,service experience
> 8 computer software copyrights
> 7 stars after sales service certificate
> ISO9001:2015,ISO14001:2015,ISO45001:2018,CE certificates
> Clients come from include but not limited: South Korea,India,Kazakhstan,Indonesia,UAE,Denmark,France,Rwanda,New Zealand,Chile,Paris,Peru,America

> DESIGN
Rata has professional technical team,they have 3~15 years load bank design experience, capable to design low and medium voltage and 2kW~10000kW,5kVA~7000kVA single load bank. We can design the load bank as per customers' reuquirement and based on related standards.

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> PRODUCTION
Rata has professional technical team and skilled workers, all the production workers has 1-10 years load bank production experience. All the products produced based on the technical drawings,related standard(ISO9001),production /test/metering equipment(35 types).


1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> FACTORY TEST/ONSITE SERVICE
All rata produced products will be tested based on related standards,rules and process before delivery. Test report and video will be supplied to customer. Rata also supply charged onsite service include onsite commissioning and training.


1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> QUALITY CONTROL
In the design, production, and inspection process of the system, the seller takes the following measures to ensure that the system quality is qualified and can meet the needs of users:
> The design and production of the system are entirely based on the technical agreement agreed upon by both parties.
> Before production, provide the equipment outline drawing to the user, and after confirmation and approval, production can be carried out based on the drawing.
> During the production process, a specialized inspection department conducts strict quality inspections of the raw materials used in the system.
> Conduct full process quality tracking during component processing, assembly, and debugging, and establish product archives.
> Ensure that all accessories are advanced, brand new, complete, and reasonably arranged, in accordance with relevant national standards. The interior of the equipment is clean, the wiring is neat, all wiring conforms to the drawings, and the interfaces and switches are correctly and clearly marked.
> Strictly follow the requirements of the drawings, relevant standards, and specifications to verify the functionality and parameters of the system, ensuring that the final product can achieve all the agreed content in the technical agreement.

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> AFTER SALES SERVICE
Rata supply 7×24 hours after sales service. Rata promises to provide lifelong technical services, including the following:
> The system quality assurance period is calculated from the date of system acceptance and lasts for 12 months.
> Rata shall provide free maintenance for any quality issues that arise within the warranty period of the system.
> After encountering problems, users are guaranteed to respond within 2-8 hours based on the time difference.
> If it is necessary to dispatch technical personnel to the site to solve the problem, Rata shall ensure that they arrive at the site within 24-72 hours. Service personnel shall not evacuate until the problem is resolved.
> Users can permanently enjoy free technical consulting services.
> Save complete product technical archives for users.
> After the end of the 12 months warranty period, we provide users with lifelong paid maintenance services at a cost only.
> The supplier is required to provide a cost price list of conventional spare parts, such as resistors and contactors.
> If necessary, the seller will provide users with the most favorable price for system upgrades and renovations.


1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> CERTIFICATES
We supply ISO9001:2015,ISO14001:2015,ISO45001:2018 and CE certificates. If need other certificates,let me know.

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
> CUSTOMER VISITATION
You are warmly welcome to visit us,I will go to Mianyang/Chengdu Airport to pic you up and arrange following thing to make sure you will have a happy trip and have a comprehensive understanding of our company.

1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
FAQ
1:What is the HS code?
9030899090

2:What is the language of the operation instruction?
Generally the language will be English,but it can be your local language based on your help to translate it.

3:What is the language of the operation panel and control software?
Generally the language will be English,but it can be your local language based on your help to translate it.

4:What is the guarantee time?
Generally12 months start from commissioning on site.

5: Can you supply Certificate of Original?
Yes.

6: What are the brands for the components?
Contactor: ABB/Schneider,Breaker: ABB/Schneider,Fuse: Delixi,PLC: Siemens,Fan: Fengmai,Resistor: Zhuxing all are first level brand at international and China market.

7: What is the noise?
Actually noise:≤80dB(1m)

8:Do you support OEM?
Yes.

9:Do you support customized control software?
Yes.

10:What is the after sales service time?
We supply 7×24hrs after sales service.But maybe there is some delay caused by the time zone restrictions.

11:Who should we contact for the after sales service?
You may contact the salesman for the after sales service directly caused by the language restrictions.

12:What is the delivery time?
The delivery time based on the power capacity and quantity.

13:How to operate the load bank as "local-off-remote"?
There is indication for "local"and"remote" control on the local panel.And it is controlled by key. Turn the key to "local" direction,then can control the load bank manually;turn the key to "remote",then can control the load bank remotely.

14:Does it complicated to use the remote control software?
It is say to use the control software,we can supply the operation video for your reference.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing pictures & photos
1000kw Load Bank 20kv AC Testing Purpose for Power Grid Balancing
US $16,000-17,500 / Piece
Min. Order: 1 Piece
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
24
Year of Establishment
2013-09-09